CALL US NOW +64 9 273 2361

Email: sales@multi-trans.co.nz





LATEST JOBS

Page 1 of 2  > >>

Yolla Accommodation Unit 580 tonne

Nov 15, 2011

The eyes of both the energy world and heavy haulage industry focused on Taranaki at 10pm on...

Read more..

Mahinerangi Wind Farm Components

Jul 22, 2011

Transport of 36 towers up to 28.5m x 4.1m x 4.1m - each weighing up to 76 tonne, 36...

Read more..

Tiwai Point - 170 tonne Transformer

Jun 30, 2010

The first of two 170 tonne transformers built in Brisbane and bound for New Zealand Aluminium...

Read more..

Gallery

Photos

  • Photo Gallery

    Photo Gallery
    (18 images)

  • Boat Haulage

    Boat Haulage
    (16 images)

  • Factory Relocation - Machinery Extraction & Installation

    Factory Relocation - Machinery Extraction & Installation
    (11 images)

  • Heavy Haulage - Machinery

    Heavy Haulage - Machinery
    (5 images)

  • Overlength Loads

    Overlength Loads
    (9 images)

  • Wind Farms

    Wind Farms
    (9 images)

  • Steel Structures

    Steel Structures
    (20 images)

  • Transformers

    Transformers
    (8 images)

  • Yolla Accommodation Module 580 tonne

    Yolla Accommodation Module 580 tonne
    (10 images)

  • Steel Tanks

    Steel Tanks
    (4 images)

  • Concrete Structures

    Concrete Structures
    (3 images)